One of the last
presentations I made as an Enterprise Architect for a major DoD contractor was
to the Chief Architect of the US Veterans Administration. I walked in
with a fully prepared presentation that was to take about 10 minutes of the
time allotted to our team only to find the Chief Architect cutting the
presentation off with a question, "How do we go about creating an IT
architecture for the VA?" Even though I had a very good answer and
had applied it on a couple of occasion, my mind blanked. I want to share
with you his problem and the answer I should have given.
The Problem
The problem that the
Chief Architect of the VA has is the same problem that plagues CA's of all
large organization and most of medium and smaller organizations. That
question is base on the very logical idea very much the analog of the idea that
before you start changing the plumbing, you should know design of the current
plumbing; that is, before you can create a "to be" or "next
step" architecture you need to have a "current architecture".
Obviously, if you don't know which pipes connect where and start making
changes to the plumbing you could end up with some very interesting and
exciting results for which you may need to call your insurance company.
Likewise, if you want to improve the effectiveness and/or the cost
efficiency of the organizational processes and information systems, most
Enterprise Architects assume they must first define and delimit the
"as-is" processes and information systems for the organization.
The conundrum is that, in today's technological environment, by the time an IT architecture team has mapped out (structured and ordered) an "as is" architecture, some, most, or all of the elements and data of the architecture will be obsolete and out of date. For something as large as a major corporation, a department within a state or the federal government, the cost and effort involved would require a tour de force on a very large perhaps unprecedented scale. This cost and level of effort would be such that the senior management would cut funding to the effort as a waste of time and money, since having an "as-is" architecture by itself produces little in value to the organization.
As can be found in the literature, there are many ways to "solve" or at least ameliorate the problem of creating an "as-is" architecture. For example, one of the best, that almost works, is to chop the organization into its components and create an "as-is" architecture for each component separately. Then try to stitch the architectures together. I've tried this and it works up to a point.
There is a truism in Systems Engineering, Systems Architecture, and Enterprise Architecture, "Optimizing the sub-systems will sub-optimize the system". I have demonstrated this to many people many times and experienced it several times. But this is crux of the problem for those that try to create an Enterprise Architecture for a large organization.
The Solution
The simple answer is
"Don't". That is, "Don't attempt to create an "as
is" architecture for an organization, especially a large organization,
because it will create itself with the proper procedures in place. So how
would I do it?
1. Define, delimited, and structured an initial set of classes and attributes for the Organization's Enterprise Architecture. These should include:
- Its Charter, Mission, Goal
- Its Strategies for achieving its charter, mission, or goal
- Its Processes supporting its strategies
- Its Tooling and infrastructure
- Its Governance that affects any of the above, including:
- Internal Policies and Standards
- External Regulations and Standards
I worked with one
Enterprise Architecture database that had over fifty classes, each class with
ten or more attributes. This was a fairly mature architecture. My
recommendation, don't try to think of all the classes you may need or all of
the attributes for each class; that's way over thinking. Instead, start
simple and add through the cycles
2. Once you have designed and structured the
initial set of classed and attributes, create a data base structured according
to the design.
3. Here is the key to creating an "As-Is" Architecture by not creating it...Huh? Design and implement processes to capture the current state of strategies, processes, and tooling/infrastructure as part of review of funding for revision and upgrades to the current systems and processes.
4. When personnel in the organization propose a project insist that these personnel demonstrate the value of the process or procedure that they intend to update or upgrade. The "value" would include demonstrating which of and how the current product, system, or service enables the processes, strategies, and charter, mission, or goal of the organization. My experience has been that the initial attempts will be fuzzy and incomplete, but that as the number of proposed projects in the database (which is generally called the Asset Management System and on which the "as-is" architecture is built) increases both the completeness and clarity of the current enterprise architecture will increase.
The reason I say "Don't" try to create an "as-is" architecture is that every 3 to 7 years every component of the organization's information system will need replacement. This means that within 3 to 5 years simply by documenting and structuring the inputs from all of the efforts the organization's "as-is" architecture will be synergistically created (and at minimal cost) [Sidebar: There will be some cost because the project proposers will need to think through how their current charter, mission, or goal and the strategies they support links to and supports the overall charter, mission, or goal of the organization. This is not necessarily a bad thing.] For large organizations, no matter how much time or effort is put into attempting to create an "As-Is" Enterprise Architecture, it will take a minimum of a year and a great deal of funding; so it simply makes no sense.
As this Enterprise Architecture evolves you will begin to see a number of things that managers want to obfuscate or hide completely. For example, a number of processes and component or sub-organizations will be demonstrated to be obsolete. In this case obsolete means that the process or component organization no longer supports any of the organization's strategies or its goal. Since managers want to build or at least keep their fiefdoms they will not appreciate this much. Additionally, it will demonstrate which internal policies, regulations, and standards help the organization and which hurt it in meeting its goal. Again, the gatekeepers of these policies, regulations, and standards will object--strenuously.
But there are two more insidious problems that a good "As-Is" Enterprise Architecture will reveal, nepotism and the famous "Catch-22s".
Nepotism
Nepotism in this case is
more broadly defined than what most people think of as "nepotism".
In the sense I mean, nepotism can include creating a non-level economic
playing field. In all large organizations, but especially in the U.S. Federal
government (probably in all governments) the type of nepotism I’m identifying
is rampant. In fact a December 2016 report from the Department of Defense
highlights what most federal employees and DoD contractors have known for
years, because representatives and senators will only vote for a large program
if their district or state gets a part of it, the DoD estimates that the cost
of the program increases approximately 20 percent. This is "jobs welfare"
on a massive scale. Some major defense contractors have plants in every
state for just this reason, not because it make any sense from a cost
efficiency perspective. Further, Congress had passed laws to ensure that
minority and female owned businesses. The reason is that minorities and
women scream that the good old boy network doesn't allow them to compete for
sub-contracts [Sidebar: Actually the
reason for the "good ole boy" network is that the prime contractors
have sub-contractors that actually know what their doing. In my
experience, many times primes will "encourage"--read
subsidize--inexperienced and frequently incompetent minority and female owned
businesses in order to meet these regulations imposed on their proposals.] Again, this is a form of social welfare
to ensure all political constituents that scream loudly are appeased.
This adds up to the DoD being one of the larger governmental welfare
organizations. [Sidebar: While,
seemingly, I've picked on government organizations, especially the U.S. DoD,
and while I have found that all governmental organizations in a democracy will
have this type of nepotism. This is what lobbing is all about. Only
when it goes so far that it's plain to all and when it's not openly enacted into
law that we call it graft and corruption.] And it's not only governments that suffer from this type of
nepotism, all large organizations have the same problems, though generally on a
smaller scale. For example, sometimes the nepotism is written into union
contracts. Along with finance engineering, the auto industry in Detroit
suffered a near collapse due to contractual nepotism.
This presents a problem
for any Enterprise Architect. The as-is architecture will highlight the
nepotism of this type more clearly than any report. The Enterprise
Architect won't need to report it to the management, it will be self-evident.
I've experienced a situation, as I suspect many of you have, where the
management kills the messenger in order to not address the problem. In my
case, three times I've been chased off programs when I reported that the effort
was subsidizing silliness.
Catch-22
The second significant
problem that policies, regulations, and standards become contradictory to each
other or in combination make it impossible for the organization to achieve its
goal. Again, a good enterprise architecture will highlight these, though
frequently, when management from one generation of technology with its set of
policies and standards, finds the next upon them, they will refuse to resend or
modify the existing regulations, preferring instead, again, to kill
the messenger. So like Systems Engineers, I've found that enterprise
architects are only respected by other enterprise architects.
5. When the development and implementation team completes a project, and once it goes into operation, then as a final step in their effort, they should review the data they gave to the enterprise architect, revising the data to accurately reflect the "as-built" instead of the "as-proposed". The as-built documentation must include all component, assembly or functional, and customer acceptance testing, and all post production required changes. This documentation will inevitably lead to additional class attributes of the Asset Management System and structure in the enterprise architecture.
6. As the Asset Management System and the Enterprise Architecture matures, management should prepare for a paradigm shift in the way projects and other efforts are proposed. This is where Enterprise Architecture really demonstrates how it can make the organization both more effective and cost efficient.
A mature enterprise architecture can serve as the basis for a dynamic business or organizational process model for the organization. Management can use this model to identify obsolete processes, (and as discussed) policies, regulations, and standards; ones that the organization should eliminate. Additionally, with the help of the Enterprise Architect, management can identify missing or inhibiting processes and tools, and identify bottlenecks and dams in process flows.
Further, they can model what happens when the missing and inhibiting processes and tools are added or when the bottlenecks are eliminated or reduced. This modeling will then indicate where there is a need for new efforts and to some degree the effectiveness and cost efficiency of such efforts. It's a paradigm shift in that no longer to component or sub-units of the organization propose changes. Instead, senior management working with the Enterprise Architect and the component or sub-units will identify and fund efforts. They now have a way to measure the potential of the change in meeting the organizational goal, which means senior management has a better way of managing organizational change.
Finally, once management has identified targets for change or upgrade, the enterprise architect together with a system architect can define alternatives to meet the effort's requirements. They can model alternative process and tooling changes to forecast which has the lowest potential risk, the highest potential return, the least disruption of current activities, lowest initial cost, lowest lifecycle cost, the most adaptable or agile, or any number of other targets defined by the senior management. This will make the organization much more cost efficient, and perhaps more cost effective; and this is the purpose of Enterprise Architecture,
To sum up, using this six step, high-level process is an effective way to create both an Asset Management System (an "As-Is" Architecture) and an effective Enterprise Architecture process; perhaps the only way.
No comments:
Post a Comment