Showing posts with label The Agile Enterprise. Show all posts
Showing posts with label The Agile Enterprise. Show all posts

Thursday, August 6, 2020

CFO and CTO Versus CPO

The CFO and CTO

In this age, 1990 to 2020, the Chief Financial Officer (a financial engineer) is boss in most companies and corporations and the goal is "INCREASING STOCKHOLDER VALUE".  This includes everything from selling the company, to cooking the books, to reducing the wages, retirement, and benefits to the employee, to selling technology and knowledge to the Chinese.

In these companies and corporations, the CEO decides on a direction then asked the CFO if it is OK.  Twice I saw this for myself.  Once the CEO of a company I worked for decide to build a new plant.  This was short-term dumb, because it would reduce the next quarter's profit, but was long-term smart because the company would, and did, survive and thrive.  When the CFO said no, the CEO fired the CFO because the CEO was the son of the founder and owner.

In the second instance I saw the CFO reduce a major defense contractor from an integrated and high-morale team of over 50,000 to less than 25,000 demoralized  employees (where one Vice President call the employees "assets" that he could move or layoff at his discretion.  This was done so that the stockholders and management could make "windfall profits" when the company was sold. 

All of this weakens the economy of the nation and reduces the average worker's income, and shorten the life-span of the organization, because of the "economic lamprey eels" known as crony capitalists and day-traders.

While Chief Technology Officers don't have the political power of the Chief Financial Officers, but they too can wreck a company.  They do this by investing too much in some technologies and/or too little in others.

Frequently, they do this at the behest of the CEO, CFO, or VP of Marketing.  There are four reasons.  

First, because these individuals have read something or been to a conference of some product.  They insist that the product be used because they believe the advertising and they do not want to spend money on comparative evaluation. On several occasions, I've seen where this has led to total failure of the effort.

I've seen projects, with budgets in the tens of millions, fail due lack of requirements.  In several of these cases the supplier's of a particular product defined the requirements.  Surprise, their product was the only one to meet the requirements even though it didn't meet the users' needs and requirements.

Second, because the CFO or CTO has set a policy, including policies that require all units in a large organization to use the same tooling for different jobs or not use a tool, even though its the right tool for the job (project or program).  I had this happen to me.

In one case, I was part of a team that was using a new tool from IBM for building websites.  The tool required that we have a minimum of a 19" display to help us use the tool properly.  It took weeks before the team could get a waver to get the larger screens, then they magically disappeared on to the desks of the personnel that installed new systems.  Again, it took some doing before we had the displays we needed.

In the early and middle 1980s, I was innovating on data communications with expertise in Local Area Networks.  I had just finished leading a team that created a paperless shop floor factory system for improving its effectiveness and cost efficiency.  It used standardized protocols like 802.3 (Ethernet).  I created the shop floor network in less than 90 days that I was told was needed (otherwise I would get fired) and at half the budget allocated by IBM for the effort.  And it worked; the system won the Society of Manufacturing Engineers Lead award.

I then accepted employment at a major defense contractor of the time.  They too, were attempting to automate the shop floor of one of their factories.  They actually had employees on bicycles running around on the shop floor--they people were call expediters.  Again, I recommended the solution to the project manager.  However, the project manager decided it work because it didn't use the IBM tools and therefore it came from the wrong vendor.  One year and tens of millions of dollars later the project failed.  However, due to the next reason the project manager--a she--became a Vice President and the technical employees were RIFed.

The third reason CTOs fail is politics.  In all industries in the US, but particularly in government related industries in the US, politics always trumps competence.  Minority and female-owned businesses must always be given a percentage of the work, whether or not they are competent.  In several proposal efforts the personnel in the lab I led had to finish creating a concept demonstration in a few hours after these "firms" spent months not completing the job.

And they must fill a certain number of upper level positions whether or not they are competent.  I was interesting to me these female directors and VPs required an IT assistant to do their job as an IT VP.  This is the fourth reason CTOs fail, sheer incompetence.

One thing that these "politically correct" managers insisted on was that the technical team meet all of their foggy vague technical requirements with in a short period and on a preset budget.  After I attempted to refine the technical requirements I found that it would take twice the budget, that is a minimum of $20 million, as the $10 million could only meet about half their requirements in the time they specified.

When I recommended that we construct the system with an Initial Operating Capability (IOC) and then add components to meet the unmet requirements, they gave an unqualified NO!  They were asking for the equivalent of building a 10,000 sq. ft custom beachfront home in "the Hamptons" with an infinity pool and 4 car garage in 3 months for $100,000.  The project was predestined to fail.

For example, I recommended buying and installing a small computer system so that we could evaluate the new system.  It took from February until August to get the 33 thousand dollar system approved.  In the meantime the space allocated for it was taken up by other equipment and it sat outside for several months until space could be found. 

When we finally had a first version running, because of the bureaucratic gears grinding slowly and oh so finely I was told that we could not test the system because of the lateness; we had to meet the schedule.  No testing the system failed.

I could give many more examples of the failures of this type.  I could see these coming but didn't have the social or political skills to call a spade a pointy club.  Still finance engineering, politics, and social engineering wrecked many, many projects and programs.

A Chief Process Officer

However, there is a better way.  But it's one not taught in business colleges of Universities.  That's because it doesn't focus on finance, accounting, management, or marketing.  Instead, it focuses on the enterprise's economic engine and supporting infrastructure.   It's the organization process for creating value for its customers.

Typically, the business schools focus of the economic battery of the organization.  Think of a car's battery.  While it starts the engine it then provides the electricity that runs all of the accessories, from power windows to stereos and navigation systems--now even the accelerator pedal uses electricity.  The organization's economic battery is siphoned by the management and stockholders of the organization's profit, totally ignoring the economic engine--the company's processes and infrastructure.

If the organization had a Chief Process Officer (CPO) similar, but not identical to the Chief Operating Officer (COO), a job that has been eliminated by most companies to be replaced by the CFO.  The COO was responsible for the day to day operations of the organization's economic engine.  The job of the CPO would architect/design processes, standards, policies, tooling, and knowledge/training/talent to support the the vision, mission, or goal(s) of the organization as identified or defined by the CEO.

The CPO is responsible and accountable for:
  • First, the processes to ensure that the organization's customer(s) get the product, system, or service that meets their requirements.
  • Second, the standards and policies that enable and support the process.
  • Third, the knowledge and talents required by the process.
  • Fourth, the tooling and equipment needed for the process.
The staff of the CPO would include:
  • The personnel officer accountable for hiring, training, or at worst contracting personnel with the required knowledge and/or talents required.
  • The Chief Process Architect who is accountable for modeling the current and potential future process architecture.  The architect's team would include a number of systems engineers, technology specialists, and systems architects.
    • The systems engineers would identify and manage the customer's requirements and design and process risks
    • The technology specialist would identify and evaluate potential technological solutions.
    • The systems/enterprise architects would model the current and future processes to determine if the current process(es), technologies, standards and policies can be made (first) more effective in meeting the customers requirements, and (second) more cost efficient.
  • The Chief Financial Officer providing financial data to the modeling team.
With this organizational structure, the would provide better products, systems, or services to the customer and more cost efficiency for the organization,

Thursday, July 13, 2017

An Architecture for Creating an Ultra-secure Network and Datastore

The Problem
According to United States records, from 2006 cyber attacks to 2016, (crimes, intelligence gathering, and warfare) have gone up 1300 percent.  Other reports identified in Forbes Magazine indicate that between 2015 and 2016 there was a 200 to 450 percent increase in attacks.  I suspect that though the numbers vastly underestimate the total number of attacks.  I know that in the late 1980s, one company was averaging 10,000 attacks per day on its website and access points to the internet; of which 4000 originated in Russia (then the USSR), China, North Korea, and the like
.
There are two goals for attacks, to disrupt the entire IT infrastructure or to gather or change protected data for various nefarious purposes.  There is a multiplicity of reasons for these attack, monetary gain, political change, and so on; the “so on” is too long to enumerate.

The cost for preventing and mitigating the effects of these attacks has spawned a new multi-billion dollar industry.  Consequently, the need is for an entirely new system (network and datastore) that completely defeats all attack vectors.  That is what I’m proposing here.

The Solution A Disruptive Architecture: The Once and Future System

The Goal

The goal of the architecture presented here is to define a highly secure system for the transmission and storage of data.

The architecture is for a fundamentally different “new” network and datastore.  I put “new” in quotes because I based the architecture on a number of concepts and standards from the late 1970s to the mid-1990s.  For reasons of economies and business politics these concepts and standards were abandoned.  When I submitted the architecture for a patent and even though the architecture uses old concepts and standard in a new way, I was told that since it was based on well known concepts and standards the architecture it is unpatentable. 

Consequently, I’m presenting it in this post in the hope that someone will take serious look at it and communicate with me so that I can present the details and we can build a secure network and datastore.

The Architecture

My fundamental idea is to create a separate “data only” network and datastore.  While initially, having a worldwide network for the storage and transmission of data separate from the Internet “of everything” may seem as a ludicrous idea for those looking at the “short-term” costs for an organization; what the cost of having data stolen, corrupted, or destroyed would be for an organization?  And remember that there are  initial and recurring costs for data security on a cloud or across the internet.

This new architecture has five components.  One of them has evolved over the past twenty years.  One of them was declared obsolete thirty years ago.  One of them is based on petrified standards of the 1980s.  And one uses a new twist on current hardware and software.  The fifth is a particular form of governance.

New User Interface Security

The base technology of the new user interface has been evolving over the past twenty years at least.  It is a combination of three functional technologies.  The first is biometric recognition.  Any secure system requires some form of authentication; that you are who you say you are.  Various forms of biometric authentication, facial recognition, fingerprint identification, retinal pattern recognition, and so on, are currently the least likely forms of identification to be broken by cyber attacks.

The second security technology is a version of the smartcard.  These are credit-card-like with a data storage computer chip embedded.  Under this new function the card reader would communicate the location, time of day, and date, whereupon the card would generate a pass code based on those parameters.
 
At the same time the reader would generate a pass code also based on those parameters.  The system would accept the identification if and only if they matched.  Since any secure system requires at least to factor authentication, a user would need both the smart card (which additionally could store the biometric data) and their own body.

Finally, authorization and access control are both static for a given user interface to the system.  This means that the user of a given device (be it a terminal, PC, smart phone, etc.) can only gain access to the set of data, records, or summaries to which their entitled. 

So a contract specialist has no access to engineering data for the contract or only a limited set.  If the contract specialist attempted to sign on to another device, to which he was not preapproved, he could not get to the data to which he is entitled. The reason is that an individual must be preapproved of every terminal the individual wants to use. 

Or a doctor may not see a patient’s complete medical history without the patient’s permission. This would be a two step process.  The doctor would have to sign in on his or her device using the two-factor authentication, described above.  Then the patient would have to sign on to the same device using the same two-factor authentication to give the doctor permission to access his or her medical record.

The security meta-data and parameters are stored on the ultra-secure data network (USDN).  Any updates or changes must be made and approved through the system’s security governance function.  No dynamic changes can be made until the changes are approved.  In a political/cultural context, this governance process will be the most difficult to secure since users expect changes to be made “NOW” and the process doesn’t allow “NOW” to happen.

The Bridge

The second architectural component is the bridge from the Internet to the USDN.  This is really the key component securing the USDN from attacks.  And this is the component that was declared obsolete thirty years ago.  In the early 1980s there were many proprietary data networks.  To communicate data from one network to another required a network bridge.

The following diagram is from the patent that I applied for.  It shows an example of how changing the protocol layers or stacks creates a portcullis in the bridge that provides the ultra-security.  On the left side of the bridge are the standard Internet protocols.  Other than the top layer (called the Application Layer in the OSI model) and the bottom layer (the Physical Layer in the OSI model), all layers link and guide the communications between the sender and receiver.

Notice that the functional protocols on each side of the bridge, with the exception of the physical layer are different.  On the left side all protocols are current Internet standards.  However, on the right side the bridge uses protocols from the Open Systems Interconnect (OSI) suite.  These protocols were abandoned in the 1990s in favor of the earlier TCP/IP suite, that at the time were less expensive and much less capable. [Sidebar: “The first example of a superior principle is always less capable than a mature example of an inferior principle”].

What this means is that the entire USDN will use these OSI protocols.  Any cyber attack software developed for Internet protocols would have to be redesigned for the OSI protocols.

Even if the hackers of whatever stripe did develop software capable of exploiting vulnerabilities in the OSI protocol stack they would still need to get it onto the network.  But the design of the bridge includes a portcullis in the middle of the bridge.

This portcullis is designed to allow only data and records in well defined formats to pass.  This means that no documents can move across the bridge.  In this case “documents” includes e-mail, documents, unformatted text, files, or other unformatted data.

This stringent requirement eliminates nearly every attack vector by hackers.  For example, there is no way that a Trojan horse attachment can get into the system because e-mail, let along e-mail with attachments, is allowed access across the bridge.

As shown in the diagram, only data in specific and static XML formats is allowed to move through the portcullis.  The XML data structures are installed in the portcullis only after approval using one of the governance processes.

So, for example, medical data would use an XML version of the international medical standards, engineering data would use an XML version of STEP, and so on.  Only data exactly following those standards to which the user is entitled would get through the portcullis.. This would initially have a very large overburden in meta-security and access control data about all individuals.

The Network

The third architectural component is the network.  The network is based on petrified standards of the 1980s.  Inside the portcullis-bridge data would be free to move among the various nodes of the network using the same OSI protocol stack that is used on the right side of the portcullis-bridge shown in the diagram.

Additionally, it would use improved versions of the Directory Service (X.500) standard.  This would include using static routing meta-data (which many network analysts would say is not an improvement).  However, static routing meta-data means that if an unauthorized node magically appeared on the USDN (because some hacker tapped one of the USDN lines) the node would be recognized as a threat immediately.  Consequently, any attempt to breach the security imposed by the portcullis-bridge by directly attacking the network would fail, as long as good governance is in place.

Datastores

The last technical function is data storage.  This datastore function uses a new twist on current hardware and software design for the storage of data and information.  The twist is that only specific data and records are store, not files from outside the network. 

An organization using an USDN-like system would have its data file structures created by authorized personnel inside the USDN.  These file structures would follow the various authorized XML data structures.  No freeform data like e-mail or documents would be allowed.  [Sidebar: remember its much much simpler to create documents from data than to glean data from documents.] 

The only applications that are authorized to run on the USDN and its datastore computers are those that create, read, update, or delete records or data elements.  Reading data would include reading for transfer, and for summarization. 

For example, suppose the medical profession of a state or of the United States adopts the USDN to protect patients’ medical records.  A medical researcher may be granted access to summaries of certain data elements of patients’ record that have a particular medical problem.  This access would be granted through an approval process—part of governance—prior to obtaining the summaries.

The advantage is that the medical researcher has access to a complete set of data for the population of an area.  The downside for the researcher is that they need to have a well formulated and defensible hypothesis to work from, in order to obtain the data, and that the governance processes take time.

Governance

The Governance processes function of the system’s architecture is most critically important of the five functions because it is the only one where humans are involved—Big Time.  As discussed above there are many security functions that are static and require administrative functions to change the parameters and meta-data.  While I expect that actually changing the meta-data and parameters will be automated, the various decision making processes will not.

One obvious example is in banking.  Some financial data must be secure within a financial institution and only shared with a client.  Other data, in the form of transactions must be shared between and among banks and other financial institutions.

The USDN security meta-data would determine which data could be sent to another financial organization, what data can be sent, and other characteristics of transaction.  It would be within the USDN and not across any portion of the Internet.  It can then be retrieved by the destination organization.

For example, if all defense contractors were on the USDN then when teams formed to respond to a DoD Request For Proposal (RFP), the various teams of contractors and subcontractors could share requirements and other data within their team.  When the DoD chose the winning team, program/project, risk, and design data could be shared and shared with the customer without fear a cyber attack on one of the sub-contractors leading to the capture or corruption of the program or mission critical data.  [Sidebar: frequently a third or fourth tier sub-contractor has more vulnerabilities than the prime contractor.]

Issues

Again,”The first instance of a superior principle is always inferior to a mature example of an inferior principle.”

There are three issues with the creation of such a system. 

The first is cost; creating an entire nationwide or worldwide network is very expensive in the startup phase.  Creating (or really resurrecting in many cases) software to support the functions of the USDN will be very expensive.  There is the cost of implementing software services to interface with existing organizational applications.  Acquiring the physical cabling for the system will be expensive.  

Modifying routers to use the new protocols will be expensive. Designing, constructing, and testing the new portcullis-bridge will be very expensive.  Most of this investment will need to be done before one data element is protected.

The cost is more than a straight financial issue of building the system.  It will threaten much of the multi-billion dollar cyber security industry’s income stream.  This industry will market and lobby against building out the system.

The second issue may be used by that industry as an argument against the USDN.  The issue that the system only protects data and not other types of information like e-mail and documents.  This is true.  However, the core of any organization is its data.  Documents can be easily constructed from data, but not the other was around.

The third issue, at least initially, is the response time of the system.  Currently applications and users have come to expect nanosecond response times to dynamic requests.  Initially, at least, I predict that the response time to requests will be in terms of seconds; maybe many.  I saw this with Microsoft DOS—until version 3.1 it was bad—other products from Microsoft, Apple, and Oracle [Sidebar: I worked with Oracle 4.1] and many other hardware and software products.]  So it will be a rocky start, but ultimately it will cost much less than the recover, rebuild, patch, upgrade, and get hacked again systems of today.

Summary

While the USDN does not protect an organization from cyber attacks, it does make an organization’s mission critical data nearly invulnerable an organization will be able to recover from an attack and will make it nearly impossible for terrorists, cyber criminals, etc. to get a personal data or its mission critical data protected.


For anyone who is interested, please comment on this post.  I have much of knowledge of the processes, technology, and construction process involved than I can put in a post, but would be happy to discuss it.

Thursday, December 29, 2016

Agility, SOA, Virtual Extended Enterprise, Swarming Tactics, and Architecture

Agility and the Virtual Extended Enterprise
In the 1990s, The Agility Forum of Lehigh University defined Agility as "The ability to successfully respond to unexpected challenges and opportunities." The forum chartered a technical committee that created two documents.  The first defined the Virtual Extended Enterprise.  A second, that I co-authored was entitled The Key Needs of the Virtual Extended Enterprise.  As I describe in my book, Organizational Economics: The Formation of Wealth, a Virtual Extended Enterprise (VEE) is a cross ownership domain organization whose purpose/goal/mission is to create a particular product or service and to support it through its life cycle.  This means that a group of skilled individuals and organizations band together to form an "enterprise" whose mission is to create or innovate and design a product, produce it, support it, and finally dispose of it. 

In my book I predict that more of the VEEs will come into existence within the "high-tech" industries because consortia of small highly innovative organizations, loosely coupled (in a legal sense), will be able to out adapt larger organizations, that is, they will work inside the large organization's OODA loop.  Col. John Boyd, father of the OODA loop, based its concept on taking effective action in a time efficient manner.  In the context of battle, this is either hitting the enemy from an unexpected direction or at an unexpected time, and so on, or counter-punching a strike by the enemy in the same manner--that is, out thinking the enemy. To do this, they will need to use swarming tactics. 

Agility and Swarming Tactics
Swarming is "A method, procedure, or process for meeting unexpected challenges and taking advantage of opportunities"; sounds a lot like agility.  A swarming process has many organizational components "gang-up" on the challenge or opportunity using various swarming tactics; some of which are discussed in the examples in the following section.  To some degree, swarming is already used in "Silicon Valley" where individuals and very small firms can organize, almost over lunch, to produce a new product.  This is very much a Service Oriented Architecture (SOA) model for business, where each part of the organization is a "business service component", and the whole is a "business composite enterprise".  Still, this sounds like nothing more than a more flexible version of the waterfall (straightline) business and product life cycle model.

However, nature presents a more agile way to "out-think" the enemy or meeting a new challenge of any type, swarming tactics.  Again, Swarming is "a large number of animate or inanimate things massed together and usually in motion : throng <swarms of sightseers> <a swarm of locusts> <a swarm of meteors>."  Normally, these "things" are apparently autonomous, but  acting, operating, or moving as if in concert or by some "invisible hand".  The key characteristic of all of these examples is that the individual "things", self-directing components are much smaller than their prey or opponent, yet as a team or organization they overcome with ease.  The agility comes from the different types of (service) components, their assembly, and the tactics of their response.  Here are three well known examples.

Army Ants--Army Ants use at least two forms of swarming in their exploitation of their environment.  In fact their "Missions" are "to provide food for the army" and "protect their bivouac (nest)".  This is true of all life.  However, the strategies and swarming tactics they use are different from the "biggest animal with the most teeth, wins" strategy of most animals.  Instead, the ants search for prey either in somewhat parallel columns or in a fan shape.  When they come upon a prey, the first ants to encounter it signal to others while immediately latching onto it.  Then additional ants join, swarming on the unfortunate prey. [Sidebar: This could include humans that are young enough, silly enough, injured enough to not walk away from the ant army.  According to one article, up to 5 people a year are killed by army ants.]

Antibodies--White blood cells and other antibodies are the second example.  Their mission is to defend the body from invading microorganisms including viruses.  They are on the alert for anything that is not foreign to the body and when discovered swarm in on it.  The antibodies are agile in both that they have ability to sense, methods for swarming, and the organization/tooling enable the methods.  One of the reasons for the effectiveness of flu shots (or vaccines) is that they introduce "life-like" targets for the antibodies to practice on (the actual microorganisms, but dead).  This enables the antibodies to reconfigure or reorganize themselves to sense the microorganisms and plan the swarming attack.  Consequently, when the body is attacked by a microorganism resembling the dead microorganism in the shot, the antibodies execute the plan and, hopefully, the microorganism.

Wolf Packs--Wolf packs are yet another organism (animal) that uses swarming tactics to survive.  Like the army ants, the wolf pack has two missions; "to provide food for the army" and "protect their bivouac (i.e., the den and the young and old)".  A single wolf, however large and ferocious, is not able to "take down" even the weakest bull elk or moose by itself.  However, wolves have senses, intelligence, and communications skills that the ants may not have.  For example, they smell their prey herd at a significant distance; they use a relay method to chase a herd until the weak cannot keep up; and they then swarm the weak member using their combined fangs to overwhelm the larger prey/opponent.  On defense of their den they are equally as voracious.

Examples in the organizational Environment
Strategies are used by organizations to achieve their Mission(s) and Mission(s) are used the organization to achieve its Vision.  Strategies are the plans for achieving a goal (or Mission), tactics are the patterns of attack whether it's another organization or a problem or obstacle in the way of the achieving the Mission and Vision.  This is important for Enterprise Architects to remember.

One set of organizational tactical patterns is the set swarming patterns.  It is one of the most sophisticated, complex, yet elegant patterns when successfully executed.  The risk is that it is agile, which is both its strength and its weakness.  Here are examples of each.

WWII US Army Task Groups and Task Forces
In WWII, both the US Army and Navy used reconfigurable units, and to some degree swarming tactics, to their advantage.  After WWI, that is in the 1920s and early 1930s, the cavalry and the infantry each thought they knew the properly role for tanks, the cavalry for exploiting breakthoughs (a typical mission of the cavalry), the infantry to support the infantry on defense and in creating breakthroughs.  Consequently, the infantry wanted a slow moving tanks (maximum speed of about 5 MPH) that was heavily armored.  In contrast, the cavalry wanted fast moving tanks, which meant that they would be much more lightly armored.

In the two years that followed the appointment of George C. Marshall as Chief of Staff of the US Army, he transformed the upper echelons of that organization.  Among the many reforms, he created the Chief of Armor.  Prior there was a armored "cavalry" regiment at Camp (Fort) Knox and an armored "infantry" regiment at Fort Benning.  These had been organized as "experimental" units in the late 1930s after Chief of Staff MacArthur disbanded the early experimental units.  However, under the direction of General Edan Chaffee, the leading doctrinal theoretican and architect of armor and previously in command at Fort Knox, the initial functional design of the WWII Armored Division was constructed. [Sidebar: It is interesting to note that a couple of the leading proponents of armor in Nazi Germany were sent to Fort Knox to "observe" the experimental regiment.  When Germany attacked Poland, setting off WWII, they used most of General Chaffee's architecture and doctrine in the attack, "the Blitzkrieg".]

General Chaffee's architecture for the armored division, the basic unit at the time, included tanks and infantry regiments, with supporting artillery, engineering, and air units--in other words, all of the elements of the US Army at the time.  Consequently, the Armored Division Commander could reconfigure the elements of the attack depending on the mission and strategies employed.  After maneuvers in 1940, the Divisions were further architecturally refined to make them more agile, by eliminating the brigade structure, and having the regiments report directly to the division Commanding Officer (CO).  Then they added task group COs.  The Division CO would assign units to the task group/force CO depending on the mission and strategies to be employed.

However, it was not until the 3rd Army under General Patton's command that the agility of the armored divisions and the swarming tactics showed its full flower with air/ground teams using units from armored and infantry brigaded together in task forces.  This is the well known and documented race through France in August 1944.  It is shown additionally by the 90 degree swing of the 3rd Army in the Battle of the Bulge.  And finally, by the 1st Army's ability to swarm the Ludendorf railroad bridge across the Rhine at Remagen, creating a crossing where none had been "planned" and exploiting it.

The Film-Making Industry
An example that I use in my book is of the film industry.  One well known example of this type of enterprise are movie companies. They form to make a movie and dissolve once the final product is on the market (for some movie franchises, this may be a fair number of years).  The movie company forms (and swarms) around a movie script or concept. Once the movie is made the organized swarms dissolves with each component off in search of new opportunities.

ABB
One project oriented organization, ABB, one of the largest European corporation with about 125K employees, is built on a Swarming Architectural Pattern.  This organization is known for its management structure, which has only five levels (many organizations in the US with only 5000 employees have at least that many or more).  Yet, ABB makes money.  They do it by having many different engineering disciplines formed into relatively small teams.  According to Tom Peters, these teams are mostly self-directing/managing.  If one team finds an Request For Proposal (RFP) they cannot support or support in total, that team networks with other teams in the corporation to create a proposal, and if they win, to execute against that proposal.  In other words, the ABB team swarms on any RFP through the ABB organizational network.

Tiger Teams
Many organizations use "Tiger Teams" to rescue development and transformation programs and project that are in cost and schedule difficulties (the Programmatic Requirements).  This may be because of unanticipated technical risks, management mishandling of activities, or many other causes.  A Tiger Team is a set of personnel that are the best (most knowledgable) available to the organization.  These team members may be culled from all of the units of the organization or from other organizations.  One way to dispose of a risk is to transfer it.  [Sidebar: While most managers and financial engineers think the mitigation is the only way to disposition a risk, there are three others, including transference.  See my post The Risk Management Process]  With a Tiger Team, the risk item (the unknown) is transferred to someone who may know a solution or have a quick method for determining a solution.  The reason for having a Tiger Team is to swarm the design risk with the most knowledgeable team to increase the probability for turning the unknown into a known in a reasonable time and least expense, since any design risk may have more than one method for turning the unknown into a known.

Inhibitors and Facilitators
From the examples, above, it is clear that good systems engineering, system architecture, and enterprise architecture are the only processes that will minimize the probability and impact of the design risks in complex development based on pushing the edge of technology, and especially for swarming processes and their enabling and supporting systems and products. 

Good enterprise architecture can model the most effective investment opportunities based on the organization's mission(s), its strategies, and its swarming tactics, while good systems engineering can identify problems with requirements in the initial stages of development (when changes are most cost efficient) and system architect can create an architecture with non-redundant functions, grouped and structure in the architecture, that when allocated reduce the risk of requiring non-standard components and minimizes the effort and risk of development of the non-standard components.

Inhibitors
There are many inhibitors to agility, swarming tactics, and good supporting and enabling systems.  Three of these are described below.

Over Specification and Other Requirements Problems
One inhibitor, as amply shown in the example, is over specification of requirements and other problems with the requirements.  Over specifying requirements is one of several types of requirements issues (see other posts in my blog for additional, as well as Dr. Ralph Young's book on requirements); others being missing and "just plain wrong" requirements.  For example, I worked on an enterprise portal for a major organization.  When I joined the program, it was already in serious trouble because the sales team had promise to have the portal "fully functional" with 6 months and at half the cost that was initially estimated.  Unfortunately "fully functional" was not defined nor were the customer requirements clearly and completely defined, so the customer expected a portal of their wildest fantasies in 6 months.  This included corporate security who saw the portal effort as a way to get control of all applications on the network. 

Based on what had been promised, I tried to put together a customer system requirements document only to find that the security requirements (among others) were so over specified that it would be infeasible to meet, and impossible in the timeframe.  When I pointed this out to the customer, and recommended a series of short cycles for development--boiling a kettle at a time, instead of the ocean--my team was replaced with a new team, which failed.  After a series of catastrophic project failure by several teams, the customer finally understood that not all of the requirements could be met, or at least met in the time frame, they finally had a working enterprise portal.  It likely cost the customer 10 times as much as if the customer had followed my short cycle (agile development) plan and took at least 5 times as long.

Two ideas should be taken from this example.  First, insistent over specification and other failures in requirements management will inevitably lead to failure.  Second, attempting to use the waterfall development process and a highly managed process with incomplete and/or over specified requirements greatly increases the risk of project failure.  A better way to do it is to use short cycle development on large complex projects and programs.  Further, in doing so, swarming tactics could be used.  For example, when I led a process innovation project and concurrently managed an advance IT laboratory at a major corporation, I would hold weekly staff meetings with a team of 16 IT experts and up to 32 others.  The meetings were as much about design risk management as about weekly status for my role a program manager.  When a team member would bring up a risk or an issue, we would have a brief discussion followed by a number of team members getting together after the "status" meeting and coming to a solution.  For the team this was a swarming tactic; one that would not be "allowed" in a control freak management culture.

"Transactional Management"
There are two types of management, transactional and transformational.  Transactional management is what most people would define as "Management" or "Supervision".  This type of management creates "The Plan" and follows it regardless of whether "The Plan" still makes sense.  These are the Control Freak Management and Cultures.  They put following the plan ahead or adapting to the changing environment.  In development this type of management is called transactional (waterfall program management) method for development.

Working on a program where innovation is one key goal or high-level requirement for the program, transactional management will inevitably lead to cost and schedule overruns and most likely project failure (unless the budget and schedule drastically increase). The reason is that by definition innovation is the result of incorporating elements of the technical unknown (called risks) into product.

The level of time and budget required to convert and unknown into a known cannot be defined, only forecast; and as I can attest, sometimes if turns out much simpler than forecast, but many times even what appears to be a minor risk (a small can of worms), turns into a research effort the equivalent of the entire effort.  At this point the transactional manager goes into freak mode, creating 16 levels in the Gantt charts and holding program reviews every half day, in a futile effort to keep the project meets the business requirements of cost and schedule.

Transactional management greatly impedes swarming tactics, because swarming tactics require that the small groups are semi-autonomous. That is, they are told what their objective is, but not how to reach their objective.  It is up to them to meet the objective and to call on other teams with other skill sets as needed.  This gives control freak managers apoplexy because they have only a limited degree of control.

Communications
Early in my corporate career I had a boss who always said, "Communications is a Bitch", and it is. Words and phrases have culturally connotative and well as denotative meanings; which is one reason translation is so difficult. On technology projects they can be even more so.  One project on which I worked had a 300 page glossary of acronyms, with one acronym that was used over 50 times with completely different meanings depending on the engineering or manufacturing discipline.  Obviously, in the process of developing, constructing, or implementing a new product, system, or service poor communications will cause a great deal of process friction, which in turn adds to cost and time to a project to get everyone speaking using the same terms [Sidebar: I've termed this "violent agreement". Either having a long vehemently intense discussion around using different terms to mean the same concept or using the same terms to mean different concepts] and misunderstanding customer, functional or component requirements and specifications leading to (potentially catastrophic) product defects.  I know of an internal unpublished corporate study of several major development programs where 25 to 50 percent of the typical engineer's time was spent in meetings to get clear requirements and other sort out other engineering issues, while maybe 25 percent was spent on the actual engineering. [Sidebar: the rest was spent getting ready for program reviews, in the reviews, or getting feedback from the reviews]

Communications issues can be exacerbated when many small groups swarm on an issue for the same reasons that a single team have issues, as stated above, except they may be several orders of magnitude more difficult.

Facilitators
There are some facilitators of agility, swarming tactics, and good supporting and enabling systems.  Four of these are described below.

Standards
As weird as it sounds, having a clear and appropriate sets of standards and policies is a key facilitator for agility and swarming tactics for a project.  But, this is if and only if the set is appropriate in what the standards are for.  Too many will kill off a project in a sea of intermediate artifacts (reports, presentations, and other documents that have no purpose but to meet some policy or standard).  Too few will kill off a project slowly by the need to reconcile interfaces, among components, assemblies, and functions.  This is a great facilitator of swarming tactics

In any software development process, I would suggest that the team start with a minimum set of software interface and documentation standards.  Interface standards reduce issues with connecting modules, components, etc.  There are several such sets of standard for SOA.  Software documentation standards, including configuration management standards, greatly reduce the time for defect analysis, and will greatly help future maintenance and upgrades when the product is put into operation.  In general, the standards for hardware products and interfaces among components are well defined.

Process Design and System Architecture Derivation
A second facilitator is the combination of process design and functional derivation/functional design/system architecture.  Obviously, if the customer's "must do" requirements are poorly identified, no amount of design work will create a product that will meet what the customer really wants. [Sidebar: As defined in the CARRMA(r) product I've developed, must do  or event driven requirements define the methods, procedures, and processes the product must support.]  Consequently, a well defined process is of seminal importance when using using swarming tactics. The conundrum is that well defined methods, procedures, and processes are not always possible, especially went including technical innovations in the product, system, or service.

The derivation of clear, concise System Architecture or specification, or of a functional design is exceedingly important because it enables the program management to communicate the requirements of the functions, assemblies, and components to the swarm of technical personnel.  Again, as the many research articles and documents, the many methodologies and procedures, and the many program failures demonstrate deriving clear and concise system architecture or functional design is nearly impossible; another conundrum.

Short Cycles
One way, perhaps the only way, out of the conundrums, above, is through the use of short cycles of design, development, and construction.  That is, plan for incomplete, fuzzy customer requirements at the start of the project and an evolving system architecture/functional design.  This builds agility directly into the design/development/implementation process of the project.

To do this, first, create a high-level notional design based on the known customer requirements.  With the customer, identify any defects in this design and with the design/development team identify any unknowns (risks).  Second, build a prototype of the core of the application and share it with the customer.  Constructing this first prototype should take about one month.  The core should include the main interface with the user(s) and the access control and/or safety function(s).  I have found that showing the customer this prototype will do two things, elicit wire brushing from the customer for miss interpretation of the fuzzy requirements the customer identified and much clearer and more complete requirements.

At the same time, start to prototype all unknowns in the system in short monthly cycles.  This is where the swarming tactics begin.  The initial build of the prototypes will demonstrate which unknowns will be easy to make known and which won't.

After the first monthly cycle have the customer choose which of the know set of requirement to implement first (prioritization of the customer's requirements), then choose one or more to implement during the next short cycle.  At the same time continue to prototype the unknowns.  Demonstrate to the customer where a particular customer requirement is leading to unknowns (risks) that will shortly create issues (technical, cost, and/or scheduling problems).  If there is a required function with a high risk (very likely to occur) with a high impact on the effort, focus the swarming on that unknown.

At the end of the second monthly cycle demonstrate the product to the customer.  I have found that after the second or third cycle (two to three months) that the customer will deem the product the IOC (initial operating capability) and want it put into production.  In each short cycle you can add functionality to the production system and with the customer, you may (and most likely will) add to the customer's requirements list.  This method will greatly increase customer satisfaction.

Transformational management
To use swarming tactics requires a transformational management style.  A transformational management style means that the management adapts the project to the changing customer requirements and priorities of the requirements, the identification of unknowns (risks) and possibly the introduction of new technology in the process of designing, developing, constructing, and delivering a new (custom) product.  This is in stark contrast to the transactional management that cast the requirements and project plan in concrete and allows for no deviation until the project fails.

Enter EA, SA, and SOA
At first blush, Agility, and System Architecture/Enterprise Architecture seem to be diametrically opposed to one another; agility requires flexibility while one characteristic of architecture is rigidity.  Yet, in fact, architecture is a method for structuring, ordering, and organizing functions (a functional design) to meet the customer's requirements.  So what is an agile architecture that enables swarming tactics?  Enterprise Architecture provides the mission or goal, the strategies, processes, procedures, and governance supporting early, clear, and complete identification of the customer requirements for the project.  System Architecture provides the ordered and structured functions of the product supporting the design to meet the customer's requirements.

VEE, Swarming Tactics, and SOA
As defined and discussed in many of my prior posts, a VEE or Virtual Extended Enterprise is a form of a supply chain.  However, it is a supply chain with differences.  First, its not a parts ordering supply chain.  Instead all members of the VEE have a stake in the success of the product.  Second, its members all have peer-to-peer communications.  This means there is a coordinator of the activities in creating the product rather than a top down command and control organization.

Ford: The Integrated Supply Chain 
A typical supply chain has an Integrated Command and Control Organization to support highly structured projects and use "waterfall" transactional program management.  Each organization in the supply chain has a has a clearly defined position in the supply chain with (hopefully) clear and complete contractual technical and business requirements to meet in order to create the product.  This of supply chain organization performs quite well when technology is changing at a slow rate.  And it works particularly well for the reduction of manufacturing or implementation costs, that is making the product more cost efficient.  For example, Henry Ford introduced the Model T to the American public in 1908.  It was the first cost efficient automobile that met, from the start, the public's requirements for dependability.

The reason oft cited for Ford's and the Model T's success is the assembly line, though it was really Fort's focus on a cost efficient supply chain including the assembly line.  Ford treated the entire supply chain as a integrated command and control organization to the point that he built the Ford River Rouge facility in Dearborn Michigan as nearly a complete supply chain for the manufacturing of cars.  The integrated manufacturing facilities included docks to off load iron ore, a steel mill, a glass factory, a rubber and tire plant, and most of the other facilities needed to turn raw materials into an automobile. Now that's integration of the supply chain with a capital I.  For 19 years the Ford Motor Company manufactured the Model T successfully.  However, by 1927 other manufacturers were building cars in the same price range but with functions the Model T did not possess.  If I remember right that included electric starting (also, the only color the Model T came in was black).  So by 1927, the customer's business requirements, (cost), was superseded by the customer's increased technical requirements (new functions).   So, The Ford Motor Company had to design and manufacture a competitive vehicle or go out of business; enter the Model A.

By the 1950s, technology was changing at a rate such that the auto companies were coming out with a new design every year.  [Sidebar: In many cases it was more of a change in the surface sheet metal than a technology change, but technology was trickling in during the 1950s, and was streaming in by the 1960s.]  However, the customer could still order and pay for a car with just the functions (options) the customer desired well into the 1960s.

By the 1980s, the custom options had metamorphosed into options packages.  The reason was simple, the plethora of options, in an era of paper, custom manufacturing of each vehicle very expensive and ended up many defective vehicles; cars with the wrong options, which cost significantly more to retrofit than if they had been built with the options to meet the customer's requirements in the first place.  Additionally, it reduced the number of vehicle configurations from a very large to a more cost efficient number.  Consequently, the customers had to get used to paying for options they didn't want to get the ones they wanted--a somewhat mixed blessing for the customer.  And this is where automobile manufacturing processes supporting the customer's requirements stands at this point.

The members of the Integrated Supply Chain are hierarchically organized with functional and component requirements communicated down the chain and components and assemblies moving up the chain for final assembly.  This works well within the mass production paradigm, but not within the coming disruptive mass customization paradigm.

VEE: The Swarming Peer-to-Peer Supply Chain
As opposed to the integrated supply chain, the members of the Virtual Extended Enterprise are not hierarchically organized.  Instead, all members of the supply chain are members of the same team and sit at the same table.  This enables swarming.  When I was leading an advanced IT development and integration lab for a major defense contractor, initially I set up a hierarchical organization based on the conceptual design I had for the effort.

The goal of the effort was to virtually locate aircraft engineers, from multiple aircraft companies, rather than actually locate them.  Up to the early 1990s when there were joint efforts among major aerospace companies, engineers from all of these companies would be sent to a single location (generally the location of the contract winner) to be able to work together. The engineers at this location would include only the prime contractor and those in the second tier.  Still, the costs to the program of moving and temporarily housing all of those engineers (and sometimes their families) for years became a significant cost.  The job of our project was to use technology to reduce and/or eliminate most of those costs.

Through the first six months our effort struggled.  Then I started to empower the team of initially 12 to 16 very smart, self-starting IT professionals.  Later on 8 to 20 aircraft engineers were added.  I would provide guidance of what was needed (the requirements and to some degree the architecture (the structure and ordering of the processes) at a weekly team meeting.  The team would then identify the unknowns (risks) in potential designs.  After the meeting I would see groups form (specialty swarm) to reduce the risks and to design and code products to meet the requirements.  These groups would assign themselves tasks to be accomplished during the following week.  At the end of the week the team had generally done an astonishing amount of designing and development work.  If the team or I had identified a risk, that had not yet been reduced, a team member would bring it up at the next meeting, and another group would form after the meeting to reduce that risk.  Again, swarming tactics. 
[Sidebar: We actually used the virtual collocation environment (now called a collaborative environment) ourselves.  While it was against de jour corporate policy, the products of our lab enabled two or three young ladies with babies and toddlers to work from home; only coming in once a week for the team meeting] Once I empowered the team to swarm, and moved away from transactional management to transformational management, the project exceeded the expectations of most of the corporate management.

While I admit this was on a very small scale, it demonstrates the power of the VEE architecture and with swarming tactics for research and development efforts, that is, turning unknowns into knowns (i.e., risk reduction).  And risk reduction through innovation is the key to new technology insertion and process improvement (which means cost efficiency).

SOA and Swarming Tactics
Enter Services Oriented Architecture.  Services are components that serve a particular function and that have a standardized and published interface, which can be linked to other services.  This combination for software is an analog to children's building blocks, of which the best known are Legos.

Web Services, at the "application as a service" or the "Platform as a layer are one set of building blocks.  [Sidebar: In a typical SOA there are also, Infrastructure as a Service (better known as a component of Cloud Computing), and Data Center Facilities (also a component of Cloud Computing).]  To be a "web service" the code must have one or more "published" interfaces that is XML-based.

The job of the development team for an implementation to enable and support some new organizational process is to assemble these Web Services by structuring and ordering them, while identifying missing services that the team will need to design, code, and implement.  "Structuring and Ordering" sounds a whole like System Architecture; and it is exactly that.

While I've discussed Systems Architecture in other posts the part that's of interest in this post is the identification of missing functions and the design, development, and implementation of the functions, as well as their integration into the complete assemblage of the product. This is where the swarming tactics come in.  Like my experience in the lab, the program manager, in this case using the transformational management style, would present the entire team with the unknown (risk item) and the team members would decide if that have talents or expertise that would contribute to creating a usable service; that is the essence of the swarming tactic applied to development and implementation.  And, I've found that it's the only method that is both effective and cost efficient to creating innovative products, systems, and services.

Monday, June 20, 2011

Transformation Benefits Measurement, the Political and Technical Hard Part of Mission Alignment and Enterprise Architecture

Pre-Ramble
This post will sound argumentative (and a bit of Ranting--in fact, I will denote the rants in color.  Some will agree, some will laugh, and Management and Finance Engineering may become defensive), and probably shows my experiences with management and finance engineering (Business Management Incorporated, that owns all businesses) in attempting benefits measurement.  However, I'm trying to point out the PC landmines (especially in the Rants) that I stepped on so that other Systems Engineers, System Architects, and Enterprise Architects don't step on these particular landmines--there are still plenty of others, so find your own, then let me know.

A good many of the issues result from a poor understanding by economists and Finance Engineers of the underlying organizational economic model embodied in Adam Smith's work, which is the foundation of Capitalism.  The result of this poor understanding is an incomplete model, as I describe in Organizational Economics: The Formation of Wealth.

Transformation Benefits Measurement Issues
As Adam Smith discussed in Chapter 1, Book 1, of his Magna Opus, commonly called The Wealth of Nations, a transformation of process and the insertion of tools transforms the productivity processes.  Adam Smith called the process transformation "The division of labour", or more commonly today, the assembly line.  At the time, 1776, where all industry of "cottage industry" this transformation Enterprise Architecture was revolutionary.  He did this using an example of straight pin production.  Further, he discussed that concept that tooling makes this process even more effective, since tools are process multipliers. In the military, their tools, weapons, are "force multipliers", which for the military is a major part of their process. Therefore, both transformation of processes and transforming tooling should increase the productivity of an organization.  Productivity is increasing the effectiveness of the processes of an organization to achieve its Vision or meet the requirements of it various Missions supporting the vision.

The current global business cultural, especial finance from Wall St. to the individual CFOs and other "finance engineers", militates against reasonable benefits measurement of the transformation of processes and insertion and maintenance of tools.  The problem is that finance engineers do not believe in either increased process effectiveness or cost avoidance (to increase the cost efficiency of a process).

Issue #1 the GFI Process
Part of the problem is the way most organizations decide on IT investments in processes and tooling.  The traditional method is the GFI (Go For It) methodology that involves two functions, a "beauty contest" and "backroom political dickering".  That is, every function within an organization has its own pet projects to make its function better (and thereby its management's bonuses larger).  The GFI decision support process is usually served up with strong dashes of NIH (Not Invented Here) and LSI (Last Salesman In) syndromes.

This is like every station on an assembly line dickering for funding to better perform its function.  The more PC functions would have an air conditioned room to watch the automated tooling perform the task, while those less PC would have their personnel chained to the workstation, while they used hand tools to perform their function; and not any hand tools, but the ones management thought they needed--useful or not.  Contrast this with the way the Manufacturing Engineering units of most manufacturing companies work.  And please don't think I'm using hyperbole because I can cite chapter and verse where I've seen it, and in after hours discussions with cohorts from other organizations, they've told me the same story.

As I've discussed in A Model of an Organization's Control Function using IDEF0 Model, The OODA Loop, and Enterprise Architecture, the Enterprise Architect and System Architect can serve in the "Manufacturing Engineer" role for many types of investment decisions.  However, this is still culturally unpalatable in many organizations since it gives less wiggle room to finance engineers and managers.

Issue #2 Poorly Formalized Increased Process Effectiveness Measuring Procedures
One key reason (or at least rationale) why management and especially finance engineers find wiggle room is that organizations (management and finance engineering) is unable (unwilling) to fund the procedures and tooling to accurately determine pre- and post-transformation process effectiveness because performing the procedures and maintaining the tools uses resources, while providing no ROI--this quarter. [Better to use the money for Management Incentives, rather than measuring the decisions management makes].

To demonstrate how poorly the finance engineering religion understands the concept of Increased Process Effectiveness, I will use the example of Cost Avoidance, which is not necessarily even Process Effectiveness, but is usually Cost Efficiency.  Typically, Cost Avoidance is investing in training, process design, or tooling now to reduce the cost of operating or maintaining the processes and tooling later. 

[Rant 1: a good basic academic definition and explanation cost avoidance is found at http://www.esourcingwiki.com/index.php/Cost_Reduction_and_Avoidance.  It includes this definition:
"Cost avoidance is a cost reduction that results from a spend that is lower then the spend that would have otherwise been required if the cost avoidance exercise had not been undertaken." ]
As discussed in the article just cited, in the religion of Finance Engineering, cost avoidance is considered as "soft" or "intangible".  The reason finance engineer cite for not believing cost avoidance number is that the "savings classified as avoidance (are suspect) due to a lack of historical comparison." 

[Rant 2: Of course Cost Reduction Saving is like that of avoiding a risk (an unknown) by changing the design is not valid, see my post The Risk Management Process because the risk never turned into an issue (a problem).] 

This is as opposed to cost reduction, where the Finance Engineer can measure the results in ROI.  This makes cost reduction efforts much more palatable to Finance Engineers, managers, and Wall St. Traders.  Consequently, increased cost efficiency is much more highly valued by this group than Increased Process Effectiveness.  Yet, as discussed above, the reason for tools (and process transformations) is to Increase Process Effectiveness.   So, Finance Engineering puts the "emphassus on the wrong salobul".

They are aided an abetted by (transactional and other non-leader) management.  A discussed recently on CNBC Squawk Box, the recent the CEOs of major corporations cite for their obscenely high salaries is that they make decisions that avoid risk. 

[Rant 3: Of course this is ignoring the fact that going into and operating a business is risky, by definition; and any company that avoids risk is on the "going out of business curve".  So most executives in US Companies today are paid 7 figure salaries to put their companies on "the going out of business curve"--interesting]

However, Cost Avoidance is one of two ways to grow a business.  The first is to invent a new product or innovate on an existing product (e.g., the IPAD) such that the company generates new business.  The second, is to Increase Process Effectiveness. 

Management, especially mid- and upper-level management, does not want to acknowledge the role of process transformation or the addition or upgrade of tooling as increasing the effectiveness of a process, procedure, method, or function.  The reason is simple, it undermines the ability for them to claim it as their own ability to manage their assets (read employees) better and therefore "earn" a bonus or promotion.  Consequently, this leaves those Enterprise and System Architects always attempting to "prove their worth" without using the metric that irrefutably prove the point.

These are the key cultural issue (problems) in selling real Enterprise Architecture and System Architecture.  And frankly, the only organizations that will accept this cultural type of change are entrepreneurial, and those large organization in a panic or desperation.  These are the only ones that are willing to change their culture.

Benefits Measurement within the OODA Loop
Being an Enterprise and an Organizational Process Architect, as well as a Systems Engineer and System Architect, I know well that measuring the benefits of a transformation (i.e., cost avoidance) is technically difficult at best; and is especially so, if the only metrics "management" considers are financial. 

Measuring Increased Process Effectiveness
In an internal paper I did in 2008, Measuring the Process Effectiveness of Deliverable of a Program [Rant 4: ignored with dignity by at least two organizations when I proposed R&D to create a benefits measurement procedure], I cited a paper: John Ward, Peter Murray and Elizabeth Daniel, Benefits Management Best Practice Guidelines (2004, Document Number: ISRC-BM-200401: Information Systems Research Centre Cranfield School of Management), that posits four types of metric that can be used to measure benefits (a very good paper by the way).
  1. Financial--Obviously
  2. Quantifiable--Metrics that organization is currently using to measure its process(es) performance and dependability that will predictably change with the development or transformation; the metrics will demonstrate the benefits (or lack thereof).  This type of metric will provide hard, but not financial, evidence that the transformation has benefits.  Typically, the organization knows both the minimum and maximum for the metric (e.g., 0% to 100%).
  3. Measurable--Metrics that organization is not currently using to measure its performance, but that should measurably demonstrate the benefits of the development or transformation.  Typically, these metrics have a minimum, like 0, but no obvious maximum.  For example, I'm currently tracking the number of pages accessed per day.  I know that if no one reads a page the metric will be zero.  However, I have no idea of the potential readership for anyone post because most of the ideas presented here are concepts that will be of utility in the future. [Rant 5: I had one VP who was letting me know he was going to lay me off from an organization that claimed it was an advance technology integrator that "he was beginning to understand was I had been talking about two years before"--that's from a VP of an organization claiming to be advanced in their thinking about technology integration--Huh....]  Still, I have a good idea of the readership of each post from the data,  what the readership is interested in and what falls flat on its face.  Measurable metrics will show or demonstrate the benefits, but cannot be used to forecast those benefits.  Another example is of a RAD process I created in 2000.  This process was the first RAD process that I know of, that the SEI considered as Conformant; that is, found in conformance by an SEI Auditor.  At the time, I had no way to measure its success except by project adoption rate (0 being no projects used it).  By 2004, within the organization I worked for, that did several hundred small, medium, and large efforts per year, over half of them were using the process.  I wanted to move from measurable to quantitative, using metrics like defects per roll out, customer satisfaction, additional customer funding, effort spent per requirement (use case), and so on, but "the management considered collecting this data, analyzing and storing it to be an expense, not an investment and since the organization was only CMMI level 3 and not level 4, this proved infeasible.   [Rant 6: It seems to me that weather forecasters and Wall St. Market Analysts are the only ones that can be paid to use measurable metrics to forecast, whether they are right wrong, or indifferent--and the Wall St. analysts are paid a great deal even when they are wrong.]
  4. Observable--Observable is the least quantitative, which is to say the most qualitative, of the metric types.  These are metrics with no definite minimum or maximum.  Instead, they are metrics that the participants agree on ahead of time--requirements? (see my post Types of Requirements.)  These metrics are really little more than any positive change that occurs after the transformation.  At worst they are anecdotal evidence.  Unfortunately, because Financial Engineers and Managers (for reasons discussed above) are not willing to invest in procedures and tooling for better metrics like those above, unless they are forced into it by customers, (e.g., requiring CMMI Level 5), Enterprise Architects, System Architects, and Systems Engineer must rely on anecdotal evidence, the weakest kind, to validate the benefits of a transformation.
Metric Context Dimensions
Having metrics to measure the benefits is good, if and only if, the metrics are in context.  In my internal paper, Measuring the Process Effectiveness of Deliverable of a Program, which I cited above, I found a total of four contextual dimensions, and since I have discovered a fifth.  I give two, to illustrate what I mean.

In several previous posts I've used the IDEF0 pattern as a model of the organization (see Figure 1 in A Model of an Organization's Control Function using IDEF0 Model, The OODA Loop, and Enterprise Architecture in particular).  One context for the metrics is whether the particular metric is measuring improvement in the process, the mechanisms (tooling), or in the control functions; a transformation may affect all three.  If it affects two of the pattern's abstract components or all three, the transformation may affect each either by increasing or decreasing the benefit.  Then the Enterprise Architect must determine the "net benefit."

The key to this "net benefit" is to determine how well the metric(s) of each component measures the organization's movement or change in velocity of movement toward achieving its Vision and/or Mission.  This is a second context.  As I said, there are at least three more.

Measuring Increased Cost Efficiency
While measuring the Benefits that accrue from a transformation is difficult (just plain hard), measuring the increased cost efficiency is simple and easy--relatively--because it is based on cost reduction, not cost avoidance.  The operative word is "relatively", since management and others will claim that their skill and knowledge reduced the cost, not the effort of the transformation team or the Enterprise Architecture team that analyzed, discovered, and recommended the transformation.  [Rant 7: More times than I can count, I have had and seen efforts where management did everything possible to kill off a transformation effort, then when it was obvious to all that the effort was producing results "pile on" to attempt to garner as much credit for the effort as possible.  One very minor example for my experience was that in 2000, my boss at the time told me that I should not be "wasting so much time on creating a CMMI Level 3 RAD process, but instead should be doing real work."  I call this behavior the "Al Gore" or "Project Credit Piling On" Syndrome (In his election bid Al Gore attempted to take all the credit for the Internet and having participated in its development for years prior, I and all of my cohorts resented the attempt).  Sir Arthur Clarke captured this syndrome in his Law of Revolutionary Development.
"Every revolutionary idea evokes three stages of reaction. They can be summed up as:
–It is Impossible—don’t Waste My Time!
–It is Possible, but not Worth Doing!
–I Said it was a Good Idea All Along!"]

Consequently, "proving" that the engineering and implementation of the transformation actually reduced the cost, and not the "manager's superior management abilities" is difficult at best--if it weren't the manager's ability, then why pay him or her the "management bonus" [Rant 8: which is were the Management Protective Association kicks in to protect their own].

The Benefits Measurement Process
The two hardest activities of Mission Alignment and Implementation Process are Observe and Orient, as defined within the OODA Loop (see A Model of an Organization's Control Function using IDEF0 Model, The OODA Loop, and Enterprise Architecture for the definitions of these tasks or functions of the OODA Loop).  To really observe processes the results and affects of a process transformation requires an organizational process as described, in part, by the CMMI Level 4 Key Practices or some of the requirements of the ISO 9001 standards.

As usual, I will submit to the reader that the keys (culturally and in a business sense) to getting the the organization to measure the success (benefits) of its investment decisions and its policy and management decisions is twofold.  The first high-level activity is a quick, (and therefore, necessarily incomplete) inventory of its Mission(s), Strategies, Processes and tooling assets.  As I describe in Initially implementing an Asset and Enterprise Architecture Process and an AEAR, this might consist of documenting and inserting the data of the final configuration of each new transformation effort as it is rolled out into an AEAR during an initial 3 month period; and additionally inserting current Policies and Standards (with their associate Business Rules) into the AEAR.  Second, analyze the requirements of each effort (the metrics associated with the requirements, really) to determine the effort's success metrics.  Using the Benefits Context Matrix determine where these metrics are incomplete (in some cases), over defined (in others), obtuse and opaque, or conflicting among themselves.  The Enterprise Architect would present the results of these analyses to management, together with recommendations for better metrics and more Process Effective transformation efforts (projects an programs).

The second high-level activity is to implement procedures and tooling to more effectively to efficiently observe and orient the benefits through the metrics (as well as the rest of the Mission Alignment/Mission Implementation Cycles).  Both of these activities should have demonstrable results (an Initial Operating Capability, IOC) by the end of the first 3 month Mission Alignment cycle.  The IOC need not be much, but it must be implemented, not some notional or conceptual design.  This forces the organization to invest resources in measurements of benefits and perhaps, in which component the benefits exist, control, process, or mechanisms.

Initially, expect that the results from the Benefits Metrics to be lousy for at least three reasons.  First, the AEAR is skeletal at best.  Second, the organization and all the participants, including the Enterprise Architect have a learning curve with respect to the process.  Third, the initially set of benefits metrics will not really measure the benefits, or at least not effectively measure the benefits. 

For example,I have been told, and believe to be true, that several years ago, the management of a Fortune 500 company chose IBM's MQSeries as middleware, to interlink many of its "standalone" systems in its fragmented architecture.  This was a good to excellent decision in the age before SOA, since the average maintenance cost for a business critical custom link was about $100 per link per month and the company had several hundred business critical links.  The IBM solution standardized the procedure for inter-linkage in a central communications hub using an IBM standard protocol.  Using the MQSeries communications solution required standardized messaging connectors.  Each new installation of a connector was a cost to the organization.  But, since connectors could be reused, IBM could right claim that the Total Cost of Ownership (TCO) for the inter-linkage would be significantly reduced. 

However, since the "benefit" of migrating to the IBM solution was "Cost Reduction", not Increased Process Effectiveness [RANT 9: Cost Avoidance in Finance Engineering parlance], Management and Finance Engineering (Yes, both had to agree), directed that the company would migrate its systems.  That was good, until they identified the "Benefit Metric" on which the management would get their bonuses.  That benefit metric was "The number of new connector installed".  While it sounds reasonable, the result was hundreds of new connectors were installed, but few connectors were reused because the management was not rewarded for reuse, just new connectors.  Finance Engineering took a look at the IBM Invoice and had apoplexy!  It cost more in a situation where they had a guarantee from the supplier that it would cost less [RANT 10: And an IBM guarantee reduced risk to zero].  The result was that the benefit (increased cost efficiency) metric was changed to "The number of interfaces reusing existing connectors, or where not possible new connectors".  Since clear identification and delineation of metrics is difficult even for Increased Cost Efficiency (Cost Reduction), it will be more so for Increased Process Effectiveness (Cost Avoidance).
Having effectively rained on every one's parade, I still maintain that with the support of the organization' s leadership, the Enterprise Architect, can create a Transformation Benefits Measurement procedure with good benefit (Increased Process Effectiveness) metrics in 3 to 4 cycles of the Mission Alignment Process.  And customer's requiring the suppliers to follow CMMI Level 5 Key Practices, SOA as an architectural pattern or functional design, together with Business Process Modeling, and Business Activity Monitoring and Management (BAMM) tooling will all help drive the effort.

For example, BAMM used in conjunction with SOA-based Services will enable the Enterprise Architect to determine such prosaic metrics as Process Throughput (in addition to determining bottlenecks) before and after a ttransformation. [RANT 11: Management and Finance Engineering are nearly psychologically incapable of allowing a team to measure a Process, System, or Service after its been put into production, let alone measuring these before the transformation.  This is the reason I recommend that the Enterprise Architecture processes, Like Mission Alignment be short cycles instead of straight through one off processes like the waterfall process--each cycle allow the Enterprise Architect to measure the results and correct defects in the transformation and in the metrics.  It's also the reason I recommend that the Enterprise Architect be on the CEO staff, rather that a hired consulting firm.] Other BAMM-derived metrics might be the cost and time used per unit produced across the process, the increase in quality (decreased defects), up-time of functions of the process, customer satisfaction, employee satisfaction (employee morale increases with successful processes), and so on.  These all help the Enterprise Architect Observe and Orient the changes in the process due to the transformation, as part of the OODA Loop-based Mission Alignment/Mission Implementation process.